Book a Site Visit
Wall stud bays filled with closed-cell spray foam insulation
What We Upgrade

Better Performance From The House You Already Have

Drafty rooms, cold floors, ice dams, and condensation on windows usually trace back to the same few problems: missing insulation, air leaking through the building envelope, and moisture moving where it shouldn't.

Mattia spent years on passive house projects in Italy before moving to the U.S., and brings the same building-science approach to existing homes. Each upgrade starts by finding where the house is losing heat and why, then fixing it in the order that gives you the most comfort for the money.

Book a Site Visit
What's Included

Upgrades Planned Around Your Building

  • 01

    Insulation Upgrades

    Walls, attics, roofs, and floors insulated with materials chosen for each assembly and installed without gaps or compression.

  • 02

    Air Sealing

    Leaks at rim joists, top plates, penetrations, windows, and doors sealed, often the biggest single improvement in comfort.

  • 03

    Moisture Management

    Vapor control, flashing, and drying paths detailed so walls and roofs stay dry once the house is tighter and warmer.

  • 04

    Window and Door Upgrades

    Energy-efficient windows and doors installed with proper flashing and air sealing at the rough opening.

  • 05

    Exterior Insulation and Re-Siding

    Continuous insulation added outside the sheathing during re-siding, which cuts heat loss through the framing itself.

  • 06

    Basements and Attics

    Rim joists, foundation walls, attic floors, and hatches brought up to standard, where many older homes lose the most heat.

Window rough opening with black flashing tape lapped over green sheathing
Basement rim joist air-sealed with spray foam above a concrete foundation wall
Mineral wool insulation behind a taped vapor-retarder membrane
Why It Matters

Why Upgrades Need A Plan

Adding insulation without dealing with air leaks and moisture can make a house worse. Warm, damp air that gets into a newly insulated wall or attic can condense, and the damage stays hidden until it shows up as mold or rot.

We treat insulation, air sealing, and moisture control as one system. It's the approach behind passive house construction, and it keeps an upgraded home comfortable and durable for the long term.

  • Air leaks found and sealed before insulation goes in
  • Insulation chosen to suit each wall and roof assembly
  • Vapor control and drying paths planned for every wall and roof
  • Ventilation considered as the house gets tighter
Book a Site Visit
Ready To Upgrade

Let's Find Out Where Your Home Is Losing Energy

On a site visit we look at the building envelope, talk through the comfort problems you've noticed, and outline which upgrades would make the biggest difference.

Book a Site Visit
How It Works

A Clear Process From Assessment To Results

Upgrades work best in the right order. A clear process makes sure each dollar goes where it makes the most difference to comfort and energy use.

  1. Site Visit and Envelope Review

    We walk the house with you, look at insulation, air leakage points, and moisture problems, and talk through what you've noticed day to day.

  2. Prioritized Estimate

    You receive an itemized estimate that ranks the upgrades by impact, so you can see which improvements do the most for your budget.

  3. Planning and Detailing

    Each assembly is detailed for insulation, air sealing, and vapor control before work begins, including how it connects to the rest of the house.

  4. Air Sealing First

    Leaks are sealed before insulation goes in, while the gaps are still visible and reachable.

  5. Insulation and Moisture Control

    Insulation, membranes, and flashing are installed with the same detailing standards used in passive house construction.

  6. Final Walkthrough

    We walk through the finished work with you and explain what was done where, so you know how your house now performs.

Why Choose Us

Building Science
In Every Upgrade

  • European Craftsmanship

    Careful detailing at every seam, tape joint, and penetration, where most energy upgrades succeed or fail.

  • Passive House Background

    Years of passive house work in Italy and LEED Green Associate training shape how every upgrade is planned.

  • Hands-On From Start to Finish

    Mattia installs and checks the work himself, so the air sealing and insulation are done the way they were planned.

  • Lean, Cost-Efficient Model

    Minimal overhead keeps high-performance upgrades within reach, and the estimate shows which ones pay off first.

Timber-framed structure before sheathing
The same structure after ZIP System sheathing and window framing
BeforeAfter

Ready to Start Your Next Project?

Book a Site Visit
Small addition wrapped in green ZIP System sheathing with a carpenter building the entry steps
Asked questions

Frequently
Asked Questions

  • Usually through air leaks at the rim joist, attic floor, and around windows and doors, before insulation levels even come into it. That's why we find and seal leaks first.

  • Often, yes. Attics, basements, and rim joists can usually be upgraded without opening finished walls, and exterior insulation can go on during re-siding. We'll tell you what's realistic after seeing the house.

  • Not if moisture and ventilation are planned along with the air sealing. We detail vapor control and drying paths for each assembly and look at ventilation as the house gets tighter.

  • Yes. We install energy-efficient windows and doors with proper flashing and air sealing at the rough opening, which is where most window installations leak.

  • Yes, and it's the most cost-effective time. With walls and ceilings open, insulation and air sealing can be done properly instead of worked around.

  • Southern Vermont, New York City, and Martha's Vineyard, MA. If your project is somewhere else, get in touch and we'll tell you whether we can take it on.